Owner’s Operation and Instruction ManualCSSUCOMPANYUNITED STATES STOVESAFETY NOTICE:If this heater is not properly installed, a house re may result.
10 UsscCHIMNEY CONNECTOR (STOVE PIPE)Your chimney connector and chimney must have the same diameter as the stove outlet (6”). If this is not the case,
Ussc 11CHIMNEYYour wood stove may be hooked up with a 6” factory built or masonry chimney. If you are using a fac-torybuiltchimney,itmustcomplyw
12 UsscFACTORY BUILT CHIMNEY :When a metal prefabricated chimney is used, the manufacturer’s installation instructions must be followed. You must als
Ussc 13MASONRY CHIMNEY :Ensure that a masonry chimney meets the minimum standards of the National Fire Protection As-sociation (NFPA) by having it ins
14 UsscCombustible Wall Chimney Connector Pass-ThroughsMethod A. 12” (304.8 mm) Clearance to Combustible Wall Mem-ber: Using a minimum thickness 3.5”
Ussc 15OUTSIDE COMBUSTION AIRYour wood stove is approved to be installed with an outside air intake which is necessary for a tightly constructed home
16 UsscTYPE WEIGHT(LBS. CU. FT., DRY)PER CORD EFFICIENCY RANKINGSPLITS MILLIONS BTU’s/CORDHickory 63 4500 1.0 Well 31.5White Oak 48 4100 .9 Fair 28.6R
Ussc 17THE FIRST FIRESThe fresh paint on your stove needs to be cured to preserve its quality. Once the fuel charge is properly ignited, only burnsma
18 UsscWARNINGS• NEVEROVERFIREYOURSTOVE.IFANYPARTOFTHESTOVESTARTSTOGLOWRED,OVERFIRINGIS HAPPENING. READJUST THEAIRINTAKECONTRO
Ussc 19ASH DISPOSALAshes should be removed from the stove every few days or when ashes get to 2 to 3 inches deep. Always empty the stove when it is co
2 UsscCONGRATULATIONS!You’ve purchased a heater from North America’s oldest manufacturer of wood burning products.By heating with wood you’re helping
20 UsscREPAIR PARTS189114017182019161523252624393536373827293028333431121314325 672342221104315672981011Feed Door Assembly
Ussc 21REPAIR PARTSKey Part No. Description Qty.1 25491 Feed Door, Painted (40484) 12 25692 Handle, Painted (40515) 13 83506 3/8 x 1-1/4 Roll Pin 14 8
22 UsscNOTES
Ussc 23NOTES
24 UsscTHISMANUALWILLHELPYOUOBTAINEFFICIENT,DEPENDABLESERVICEFROMYOURHEATER,ANDENABLEYOUTOORDERREPAIRPARTSCOR-RECTLY.KEEPTHISMANU
Ussc 3" CUT HERE " CUT HEREWARRANTY INFORMATION CARDName__________________________________________ Telephone #: (_____)_____________City____
4 Ussc" CUT HERE " CUT HEREÊ ÉFold Here Fold HereUnited States Stove CompanyP.O. Box 151South Pittsburg, TN 37380Fold HerePLACESTAMPHERE
Ussc 5Tools and Materials Needed For InstallationYou will need a drill with a 1/8” bit to install sheet metal screws into connector pipe. A 5/16” sock
6 UsscASSEMBLY INSTRUCTIONSBlower AssemblyTHE BLOWER ASSEMBLY MUST BE DISCONNECTED FROM THE SOURCE OF ELECTRICAL SUPPLY BE-FORE ATTEMPTING THE INSTALL
Ussc 7INSTALLATIONSAFETY NOTICE• IF THIS STOVE IS NOT PROPERLY INSTALLED, A HOUSE FIRE MAY RESULT. TOREDUCETHERISKOFFIRE,FOLLOWTH
8 UsscFLOOR PROTECTORYour wood stove should be placed on a 1 inch, non-combustible surface with a k factor of 0.84. For multiple layers, add R-values
Ussc 9CLEARANCES TO COMBUSTIBLESIt is of utmost importance that the clearances to combustible materials be strictly adhered to during installation of
Comments to this Manuals